Project information

  • Category: Educational
  • Client:
  • Project date: 2003

Sama Beirut Tower

Supply, install, test, commission and maintain a power plant composed of 4 x 1000 KVA generators, diesel particulate filters (soot filter), synchronizing, totalizing, and main distribution panels, seismically certified vibration isolators, room sound insulation and ventilation, bus duct system, insulated exhaust flue pipes and hangers, fuel tanks with duplex pumps and piping network, motor control center, and coolant heat recovery system.